Term | Definition |
---|---|
Off-street parking |
Parking in appropriate facilities off the street. Does not refer to illegal parking at the roadside
|
Oil mist |
Type of pollution caused by air with oil particules.
|
On-street parking |
Parking within the street area whether in designated parking places or not
|
Open (face) shield |
The shield normally used in soft ground tunnelling.
|
Open cut |
A trench excavated from the surface and left uncovered until completion of the work within.
|
Open-cut tunnel |
A tunnel constructed by excavating a trench from the surface, building the structure within the trench, and then backfilling to restore the surface.
|
Operating cost |
The periodic, on-going cost of a system, facility or object. Depending on specific usage, may be restricted only to costs when a facility is used
|
Operator (equipment) |
The person with direct control of the equipment
|
Operator (system) |
A company, agency or person responsible for operation of a system
|
Options / Alternatives |
Different solutions which meet the same objectives
|
Out-of-pocket costs |
Costs directly affecting the person considered
|
Outbye |
Away from the working face toward the shaft or portal.
|
Outfitting |
See Fitting Out
|
Overbreak |
Excavation that occurs outside of the "B" line of a tunnel owing to the irregular pattern of rock breakage; the definition also describes concrete required to fill this overexcavated space in lined tunnels.
|
Overburden |
Essentially the same as cover, the total depth of soil and/or rock overlying the tunnel crown. Distinguished from another common definition as the mantle of soil or loose material overlying bed rock.
|
Overpass |
A structure including its approaches which allows one road to pass above another road (or an obstacle)
|
Owner |
A company, agency or person controlling a system, facility or object.
|