Term | Definition |
---|---|
Poling board or plate |
See forepoling
|
Pollution |
Interference with a natural system that is potentially harmful or unwanted
|
Popping rock |
An overstressed rock condition involving the spontaneous and violent detachment of rock slabs. See also rock burst.
|
Portal |
The structure or the end of the structure at the two ends of a tunnel at the interface of the covered and open sections
|
Portal |
The entrance from the ground surface to a tunnel.
|
Portal-in |
To start the tunnel excavation at the portal face.
|
Posts |
The vertical members of a steel rib or timber support system.
|
Pot |
A steel pressure vessel used for transporting concrete. At the point of placement, the concrete is ejected from the pot by use of compressed air.
|
Powder factor |
Number of pounds of powder per cubic yard of rock.
|
Powder monkey |
Slang for man who handles explosives.
|
Pre-bagged shotcrete mix |
Pre- bagged concrete or shotcrete mix supplied in bags with all ingredients oven-dried and pre-mixed
|
Pre-splitting |
A technique of inducing cracks roughly following the periphery of the rock shape to be excavated by the use of closely spaced holes and reduced explosive charges prior to main blasting; a subdivision of smooth blasting.
|
Press weld |
Brand name of an air-activated concrete placer.
|
Prestress, Temporary |
Used mainly in concrete tunnels to temporarily lock a flexible joint, to modify stresses until immersion, or to provide additional strength during transportation and installation.
|
Preventive measures |
Measures that are undertaken in order to avoid an environmental impact.
|
Price / Cost |
Sum effectively spent to obtain marketable good
|
Primary lining |
The tunnel lining placed to support the ground as the excavation proceeds.
|
Profitable |
One says this of a project that yields in total more benefits than costs. It is usually applied to financial returns.
|
Property division |
Legal division of real-estate
|
Provisions |
A measure taken beforehand / stipulation
|